Reset Search
 

 

Article

How to connect two X670-G2 switches together for native stacking

« Go Back

Information

 
TitleHow to connect two X670-G2 switches together for native stacking
Objective
Properly connect two X670-G2 switches together with the intention of stacking them natively.
Environment
  • Summit X670-G2-48x
  • EXOS
Procedure
In order to connect two X670-G2 switches together using V80 or V160 Stacking the following connections are needed:
  • Port 57 on slot-1 is to be connected to port 61 of slot-2
  • Port 57 on slot-2 is to be connected to port 61 of slot-1
For V320 stacking:
  • Port 49 on slot-1 is to be connected to port 53 of slot-2
  • Port 49 on slot-2 is to be connected to port 53 of slot-1
  • Port 57 on slot-1 is to be connected to port 61 of slot-2
  • Port 57 on slot-2 is to be connected to port 61 of slot-1
Additional notes

Feedback

 

Was this article helpful?


   

Feedback

Please tell us how we can make this article more useful.

Characters Remaining: 255